hotworkpermittemplate.comPublished by Winding AI, Inc., the company that makes Dozer Get the template
Updated November 2026 ยท rules and prices read Nov 16

Hot work permit template: every field, and the fire watch rules

A hot work permit template needs six parts: the job, the people (including the permit authorizing individual and the fire watch), the checks within 35 ft, walls and enclosed equipment, the fire watch times, and the sign-off. The free template below has all six; NFPA's and FM's free forms print a 1-hour fire watch after the work, while OSHA's general industry rule asks for 30 minutes.

Print it or copy it for free. Numbered printed permits cost $21 for 25 from J. J. Keller, and two apps start free.

In one line: Use the free template or NFPA's form, set the fire watch to 1 hour, and keep the signed permit for 48 hours or longer.
  • Rules and prices read Nov 16, 2026
  • 6 permit sources compared
  • Published by Winding AI, Inc., maker of Dozer
At a glance

Where to get a hot work permit form, side by side

Six places to get a hot work permit form, from a blank PDF to an app, with prices read on each seller's page on November 16, 2026. The fire watch column is the time each form prints, the number a crew actually follows.

Hot work permit sources compared (prices and forms read November 16, 2026)
SourcePriceFormatFire watch it printsWho signsThe catch
NFPA Hot Work Permit (free PDF)FreePDF, fill by hand1 hour, plus a box for longer monitoringPAI and the person doing the workCopy for your own use only; 2018 form
FM Hot Work Permit (F2630)Free downloadEditable PDF, two parts1 hour, then 3 hours of monitoringPAI, fire watch, fire monitorTwo parts to file
J. J. Keller Hot Work Permit Tags$21 for 25Printed 2-ply tag1 hour, then 3 hours of monitoringPAI, the worker, the fire watchPaper to buy and file
pdfFiller (fillable hot work permit)$8/mo yearly, $20 monthlyOnline PDF formNot shown on the form's pageWhoever the form namesPaying for a free form
Mitti (SafetyCulture) hot work permitFree to 10 users; $24/seat/mo yearlyApp template30 minutesThe PAI30 minutes, not NFPA's hour
Dozer (hot work JHA)Free, as many sites as you want; Site tier $99/moApp (JHA)“30 to 60 minutes, per site rules”The crew, on one phoneA JHA, not a permit form
The template

Printable hot work permit form: a sample, part by part

The sample fields a permit needs and the rule behind each check. Copy it into your own form or print this page; it is our own example, not a copy of NFPA's or FM's form.

Hot work permitGood for one job, one location, one shift

1The job

One permit per job and location, for one shift. Post it at the work area. NFPA's form is good for one day only; FM's limits authorization to one shift. Under the fire code, program permits stay available for 48 hours after the work (IFC 2024 §3503.3).

  • Permit number
  • Date
  • Building, floor and exact location
  • Work to be done: welding, cutting, brazing, grinding, soldering, torch roofing, thawing pipe
  • Equipment and fuel gases used
  • Start time
  • Expected finish time

2The people

Every role named, by a person, before the work starts. OSHA puts this on the person responsible for authorizing the work, “preferably in the form of a written permit” (29 CFR 1910.252(a)(2)(iv)). OSHA's shipyard fact sheet adds that the person doing the hot work can't be the fire watch (FS-4188), a sound rule on any job.

  • Person doing the hot work, and company (employee or contractor)
  • Permit authorizing individual (PAI): name and phone
  • Fire watch: name(s)
  • Emergency number and alarm location

3Before the work: within 35 ft

Each box ticked by the PAI at the work area, not from the office. Combustibles go at least 35 ft away or under flameproof covers, and floors are swept for 35 ft (1910.252(a)(2)(v), (vii)). Fire code: a 2-A:20-B:C extinguisher within 30 ft (IFC 2024 §3504.2.6).

  • Combustibles moved 35 ft away, or covered with welding blankets or metal guards
  • Flammable liquids, dust, lint and oily deposits removed
  • Floors swept; combustible floors wet down or covered
  • Wall and floor openings covered; ducts and conveyors protected
  • No flammable atmosphere: gas test reading and time ____
  • Sprinklers, alarms and hose lines in service
  • Fire extinguisher at the work, type ____
  • Hot work equipment checked and in good condition

4Walls, ceilings, roofs and enclosed equipment

Heat travels through metal and into hidden spaces. Construction: the same precautions on the other side of a wall, floor or ceiling (1926.352(f)). General industry: a fire watch on the opposite side where combustibles aren't moved (1910.252(a)(2)(x)).

  • Other side of the wall, ceiling or roof checked; combustibles moved
  • No combustible covering or insulation on the surface being worked
  • Tanks, drums and piping cleaned, purged, isolated and vented
  • Lined or coated vessels: special permission obtained

5Fire watch

A trained person with an extinguisher, watching during the work, breaks included, and after it. NFPA 51B: at least 1 hour after the work; the PAI may cut it to 30 minutes where nothing can burn. OSHA general industry and the fire code: 30 minutes. OSHA construction: “a sufficient period of time”.

  • Fire watch trained on the extinguisher and the alarm
  • Adjoining areas, above and below, watched too
  • Time hot work ended
  • Fire watch ends at (60 min or more after)
  • Monitoring extended beyond the fire watch? Until ____

6Sign-off

The permit closes when the area is checked and found clear. NFPA 51B's 2024 edition counts a “documented” permit, on paper or digital, when the PAI issues it.

  • PAI authorizes: signature and time
  • Person doing the work: signature
  • Fire watch: area checked and clear, signature and time
  • Final check by the PAI; permit returned and filed
Our own layout, free to copy and print. The rule notes in italics are for whoever fills it in; leave them off the printed copy. The parts follow the checks that all of the 5 published forms on the data page share.
Fire watch

How long must the fire watch stay after hot work?

At least 1 hour under NFPA 51B, the standard most permits follow; 30 minutes under OSHA's general industry rule and the fire code; no fixed number under OSHA's construction rule. Each rule read November 16, 2026:

Fire watch after hot work, by rule (read November 16, 2026)
Rule or formFire watch after the workThenApplies to
NFPA 51B, 2024 editionAt least 1 hour; the PAI may cut it to 30 minutes where nothing can burnFire monitoring for up to 3 more hours, as the PAI decidesSites that follow NFPA 51B or NFPA 1
OSHA 29 CFR 1910.252(a)(2)(iii)(B)At least half an hourNone setGeneral industry (plants, shops, buildings in use)
OSHA 29 CFR 1926.352(e)“A sufficient period of time”: no numberNone setConstruction, when normal precautions aren't enough
OSHA 29 CFR 1915.504(c)(2)(iv)At least 30 minutes, unless the area is surveyed and found clearNone setShipyards
International Fire Code 2024, §3504.2.1Not less than 30 minutesNone setWhere a city or state adopts the IFC
NYC Fire Code 2022, FC 3504.2.1At least 30 minutes; the commissioner or program may extend itNone setNew York City
FM permit F2630, Rev. 08/20241 hour; its table runs from 30 minutes to 1 hour, and torch roofing gets 2 hoursFire monitoring for 3 hours (0 to 5 hours by its table)FM-insured sites and anyone using the form
Travelers construction guidanceAt least 60 minutesNot statedTravelers' construction guidance

Use the longest time that applies to you; on a construction job that usually means NFPA 51B's hour. 1910.252 still incorporates the 1962 edition of NFPA 51B and says 30 minutes; NFPA 51B has said 1 hour since its 2019 edition.

The sources

Each permit source, with its price and its catch

Ordered from the least done for you to the most: blank forms first, then printed tags, an online form filler and two apps. Every card names its price and where it falls short. Dozer is made by this site's publisher.

1NF

NFPA Hot Work Permit (free PDF)

The standard's own form

The National Fire Protection Association's one-page permit, written to NFPA 51B: the job, the checks within 35 ft (11 m), the PAI's signature and a 1-hour fire watch.

Price: Free PDF download.

Good

  • Prints NFPA 51B's 1-hour fire watch and asks whether monitoring ran longer
  • One page; “good for one day only” is printed on it

Watch out

  • © 2018, older than the 2024 edition of NFPA 51B
  • Copy it for your own use only, not for resale
  • No permit number, and no line to name or sign for the fire watch
Visit NFPA's form
2FM

FM Hot Work Permit (F2630)

An insurer's two-part form

The property insurer FM's two-part permit: Part 1 stays with the PAI; Part 2 is posted at the job and signed off by the fire watch and a fire monitor.

Price: Free download for non-clients, editable, in 35 language versions; FM clients order printed forms.

Good

  • 1 hour of fire watch, then 3 hours of fire monitoring
  • A table on the back sets the times by building type, up to 5 hours of monitoring

Watch out

  • Two parts to track and file
  • Printed pads are only for FM clients; no public price
Visit FM's hot work page
3JK

J. J. Keller Hot Work Permit Tags

Printed, numbered tags

A numbered 6 x 9 in. two-ply tag on a wire: a white part the PAI keeps and an orange part that hangs at the work, with the checks, the fire watch times and emergency steps.

Price: $21.00 for 25 tags ($0.84 each); $0.76 each from 100 and $0.67 from 250. English or Spanish.

Good

  • Prints a 1-hour fire watch, then 3 hours of fire monitoring
  • Numbered, and the orange tag hangs at the job where everyone sees it

Watch out

  • Sold in 25s: $21 at the smallest order
  • Paper: two parts to collect and file
Visit J. J. Keller's tags
4PF

pdfFiller (fillable hot work permit)

Fill and sign online

A fillable hot work permit form in pdfFiller's online editor: type into the fields, sign, and save or send it. The Premium plan adds signNow and the US Legal Forms library.

Price: Free trial, then Basic $8 a month billed yearly or $20 month to month; Plus $12 or $30; Premium $15 or $40.

Good

  • Fill and sign on any device
  • No printer or scanner

Watch out

  • The page doesn't say who wrote the form or which edition of NFPA 51B it follows
  • Month to month is $20, while NFPA's and FM's forms are free
Visit pdfFiller's form
5MI

Mitti (SafetyCulture) hot work permit

Checklist app

SafetyCulture is now Mitti. Its free hot work permit template runs in the Mitti app: the area checks, equipment, the fire watch, the people involved and the PAI's signature, and a PDF report.

Price: Free for up to 10 users (5 active templates); Premium $24 a seat a month billed yearly, $29 monthly.

Good

  • Free for a small crew
  • Signatures and PDF reports from a phone

Watch out

  • Its template prints a 30-minute fire watch, OSHA's general industry figure, not NFPA 51B's hour
  • Says a permit is “valid for 24 hours”; NFPA and FM limit it to a day or a shift
Visit Mitti's template
6DZ

Dozer (hot work JHA)

Job hazard analysis for the site

A jobsite app for construction crews. Its hot work and welding JHA lists the hazards, the controls (35 ft, the extinguisher, a fire watch during and after, a permit where the site uses one) and the PPE; the crew signs it on one phone.

Price: Free for as many sites as you want (one camera, up to 10 machines), crew included; the Site tier is $99 a site a month after 7 days free.

Good

  • Built for the job site, not an office
  • The crew signs on one phone, no paper to collect

Watch out

  • A JHA the crew signs, not a separate permit form: no PAI sign-off or fire watch end time
  • Says “30 to 60 minutes, per site rules” for the fire watch, not one number
  • Android and web; no iPhone app yet
Visit Dozer
How to choose

How to choose a hot work permit form

Pick the form by who has to accept it, then by how the crew will fill it in.

  1. Start from whoever asks for the permit. If the GC, the owner or the insurer hands you a form, use theirs. FM-insured sites expect F2630.
  2. Check the fire watch time before anything else. If a form prints 30 minutes and your site follows NFPA 51B, change it to 1 hour.
  3. Make sure three people are named. The PAI who checks the area and signs, the person doing the work, and a fire watch who is someone else.
  4. Paper or phone? NFPA 51B's 2024 edition counts a digital permit. Paper is free and works without signal; an app keeps the times and can't get lost in a truck.
  5. Keep it. File the signed permit with the day's records; the fire code wants it available for 48 hours after the work.
FAQ

Questions people ask about hot work permits

What is a hot work permit?
A signed form that lets someone weld, cut, braze, grind or use a torch outside an area made for it, after the permit authorizing individual (PAI) checks the area and names a fire watch. NFPA's free form is good for one day; FM's for one shift.
Is there a free hot work permit PDF?
Yes. NFPA's one-page Hot Work Permit is free (copy it for your own use, not for resale), and FM's F2630 is a free, editable download for non-clients. The template on this page is free to copy and print as well.
Does OSHA have a hot work permit form?
No. OSHA publishes no hot work permit form. Its general industry rule asks for authorization “preferably in the form of a written permit” (1910.252(a)(2)(iv)), and requires a permit outright only at process safety plants (1910.119(k)) and grain facilities (1910.272(f)). Its construction rule doesn't mention one; on a job, the GC, the insurer or the fire code asks.
How long does a hot work permit last?
One day on NFPA's form and one shift on FM's; Travelers also says one shift. Under the 2024 International Fire Code, program permits must stay available for 48 hours after the work.
How long must the fire watch stay after hot work?
At least 1 hour under NFPA 51B (2024 edition), which lets the PAI cut it to 30 minutes where nothing can burn. OSHA's general industry rule, the International Fire Code and New York City say 30 minutes; OSHA's construction rule says only “a sufficient period of time”.
What does a filled-in hot work permit example look like?
Welding a bracket to a steel column on level 2: location “Level 2, gridline C-4”, work “MIG welding”, combustibles moved 35 ft or covered with welding blankets, a 2-A:20-B:C extinguisher at the work, the fire watch named, work ends 3:30 PM, fire watch until 4:30 PM, then the PAI signs the final check.
Can a hot work permit be digital?
Yes. The 2024 edition of NFPA 51B changed “written” permits to “documented” ones so that digital permits count, as long as the PAI issues it.

How this page was checked

We read OSHA's three hot work rules, NFPA's records for the 2024 edition of NFPA 51B, and the fire codes, then each form. Every rule and price was read on November 16, 2026, on the regulator's, publisher's or seller's own page, with the exceptions noted on the hot work permit checklist data page, which lists every source. Corrections: support@winding.ai.

Published by Winding AI, Inc., the company that makes Dozer, one of the 6 sources compared here. We make money when a customer pays for Dozer; links to Dozer carry a tag so it can count visits from this site, and links to everyone else earn nothing.