hotworkpermittemplate.com › Guides › Hot work permit checklist, 2026 data
Hot work permit checklist, 2026: what 5 forms and 8 rules ask for
Three of the five hot work permit forms we read print NFPA 51B's 1-hour fire watch (NFPA's, FM's and J. J. Keller's), and two say 30 minutes (Mitti's and US Legal Forms'). The rules split the same way: 1 hour under NFPA 51B and two insurers' guidance, 30 minutes under OSHA's general industry rule, shipyard rule and the fire code, and no number under OSHA's construction rule.
What do published hot work permit forms ask for?
Five forms a US crew is likely to be handed or find, read on November 16, 2026. All five check combustibles, the extinguisher and the fire watch; they differ on how long the watch stays and how long the permit lasts.
| Form | Price | Fire watch after | Then | Permit lasts |
|---|---|---|---|---|
| NFPA Hot Work Permit | Free | 1 hour | Yes/no box for longer | One day |
| FM F2630 (Rev. 08/2024) | Free download | 1 hour | 3 hours | One shift |
| Mitti (SafetyCulture) template | Free to 10 users | 30 minutes | None | “24 hours” |
| US Legal Forms checklist | Basic $8/mo yearly or $39 monthly | 30 minutes (its fill-in notes) | None | Not stated |
| J. J. Keller tag | $21 for 25 | 1 hour | 3 hours | Until the expiry time written on it |
Durham Technical Community College posts FM's form unchanged, and the University of Iowa uses a local version of it; the Bonneville Power Administration posts NFPA's. J. J. Keller's figures come from the sample tag linked on its product page. Etsy and Sitemate listings could not be read and are left out.
What do the rules say about the fire watch?
Eight rules and guidance documents. The 1-hour figure is NFPA 51B's since its 2019 edition; OSHA's general industry rule says 30 minutes and still incorporates NFPA 51B's 1962 edition.
| Rule | Applies to | Fire watch after | Then | Distance |
|---|---|---|---|---|
| OSHA 29 CFR 1910.252 | General industry | 30 minutes | None set | 35 ft |
| OSHA 29 CFR 1926.352 | Construction | “A sufficient period”, no number | None set | none stated |
| OSHA 29 CFR 1915.504 | Shipyards | 30 minutes, unless surveyed | None set | 35 ft |
| NFPA 51B | Sites that adopt it | 1 hour (the PAI may cut it to 30 minutes) | up to 3 hours | 35 ft (11 m) |
| International Fire Code | Where adopted | 30 minutes | None set | extinguisher within 30 ft |
| NYC Fire Code | New York City | 30 minutes | None set | None stated |
| FM pocket guide W00125 | FM-insured sites | 1 hour | 3 hours | 35 ft |
| Travelers hot work guidance | Construction | 1 hour | None set | None stated |
The hot work permit checklist the forms share
Every form above, and the template on the main page, checks these before work starts:
- Combustibles moved 35 ft or covered with welding blankets or guards.
- Flammable liquids, vapors, dust and lint removed; the atmosphere tested where vapors are possible.
- Floor and wall openings covered, and the other side of walls and ceilings checked.
- Sprinklers and alarms working; an extinguisher at the work.
- Hot work equipment in good condition.
- A fire watch named, with an extinguisher, for the work and the time after it.
- The PAI's signature, and a final check when the watch ends.
How the figures were read
Each form was read on its publisher's page or PDF; each rule on the regulator's page. FM's site blocked plain downloads, so its form was read from Durham Tech's copy (and the University of Iowa's local version) and its download page in a browser. NFPA 51B's 2024 text needs an NFPA login, so its changes come from NFPA's committee records; section numbers may differ in the printed edition. A price is the one shown on the seller's page; Mitti's is for its default team size. Dozer, made by this site's publisher, is not in the forms table because its hot work tool is a JHA rather than a permit form; it says “30 to 60 minutes, per site rules” (Dozer's hot work JHA).
Download every row, with its URL: hot-work-permit-forms-and-rules-2026.csv (CSV, CC BY 4.0).
Cite this
Winding AI, Inc. “Hot work permit checklist, 2026: what 5 forms and 8 rules ask for.” hotworkpermittemplate.com, November 16, 2026. https://hotworkpermittemplate.com/hot-work-permit-checklist-2026/
How this page was checked
Each form and rule was read on its publisher's own page; the CSV holds every URL. Every rule and price was read on November 16, 2026, on the regulator's, publisher's or seller's own page, with the exceptions noted on the hot work permit checklist data page, which lists every source. Corrections: support@winding.ai.
Published by Winding AI, Inc., the company that makes Dozer, one of the 6 sources compared here. We make money when a customer pays for Dozer; links to Dozer carry a tag so it can count visits from this site, and links to everyone else earn nothing.